Fonds 76-1008 - Grand Trunk Railway Engineering Department fonds

Title and statement of responsibility area

Title proper

Grand Trunk Railway Engineering Department fonds

General material designation

  • Textual record

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

Fonds

Reference code

76-1008

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • 1866-1874 (Creation)
    Creator
    Grand Trunk Railway

Physical description area

Physical description

1 item

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Name of creator

Administrative history

The Grand Trunk Railway (GTR) was built to provide a main trunk line throughout the entire length of the Province of Canada. Under the sponsorship of Sir Francis Hincks, the Grand Trunk Railway was formally incorporated in 1852 to build a railway line from Toronto to Montreal. The Grand Trunk Railway of Canada East was also incorporated to build a line from Quebec City to Trois Pistoles, Quebec. The GTR also purchased the newly completed St. Lawrence and Atlantic Railroad in 1853. Much of the financing for the Railway was to come from investors in England, and as a result, much of the construction of the new lines was done by English construction firms. The "Trunk-Line" from Montreal to Toronto opened in 1856. The railway expanded quickly, existing small railway companies were purchased, and new lines were added, some of which were destined for the United States. By 1867, the GTR was the largest railway system in the world with 2 055 km of track. By the 1880's the company had over 700 locomotives, 578 cars, 60 post-office cars, 131 baggage cars, 18 000 freight cars and 49 snow plows. The high cost of construction, absentee management (Head Office in England), and failure to generate anticipated levels of traffic left the GTR debt ridden and unable to upgrade its equipment. In October 1919, the federal government took over the GTR after a disasterous attempt to create a transcontinental railway with the creation of the Grand Trunk Pacific Railway. The GTR and the GTPR were placed under the management of the Canadian National Railways on January 30, 1923. ( Taken from: "The Canadian Encyclopedia." Edmonton: Hurtig Publishers Ltd., 1985.)

Custodial history

Scope and content

This item is a foreman's wage and material book from the Engineer Department of the Grand Trunk Railway, showing the name and occupation of workers, rate and amount of pay and material used for each four week period, 1866 to March 7, 1874. Each page bears the notation "paid at Belleville".

Notes area

Physical condition

Some of the pages a stuck together and most of the pages have been torn

Immediate source of acquisition

This item was donated from an unknown source

Arrangement

Language of material

Script of material

Location of originals

Availability of other formats

Restrictions on access

None

Terms governing use, reproduction, and publication

Finding aids

Associated materials

Associated material located at Library and Archives Canada (RG 30)

Related materials

Accruals

Alternative identifier(s)

Standard number area

Standard number

Access points

Subject access points

Name access points

Genre access points

Description record identifier

Institution identifier

Rules or conventions

Language of description

Script of description

Sources

Accession area

Related subjects

Related people and organizations

Related genres